FINAL REPORT OF SL-1 RECOVERY OPERATION, MAY 1961 THRU JULY 1962

FINAL REPORT OF SL-1 RECOVERY OPERATION, MAY 1961 THRU JULY 1962
Author :
Publisher :
Total Pages :
Release :
ISBN-10 : OCLC:727222271
ISBN-13 :
Rating : 4/5 ( Downloads)

Book Synopsis FINAL REPORT OF SL-1 RECOVERY OPERATION, MAY 1961 THRU JULY 1962 by :

Download or read book FINAL REPORT OF SL-1 RECOVERY OPERATION, MAY 1961 THRU JULY 1962 written by and published by . This book was released on 1962 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: In May, 1961, it waa determined no renewed nuclear reaction in the SL-1 pressure vessel was possible as long as water was excluded. It was therefore possible to proceed with the final phase of the SL-1 recovery. This work consisted of moving the pressure vessel and core to the Hot Shop at the north end of the National Reactor Testing Station, dissecting and analyzing the reactor and its components, cutting up and burying the reactor building, and decontaminating the rest of the SL-1 area. These things were accomplished by the General Electric Company between May 1961 and July 1962. It was determined that the central control rod was bound in its shroud at a position corresponding to 20- inch withdrawal. Analysis of the pertinent data showed that the amount of reactivity associated with this rod position, inserted at a rate compatihie with manual withdrawal of the rod, can explain the significant evidence which was coliected. No other means of withdrawing the rod was found to be in accordance with the evidence. It was found that the relatively low yield (130 Mw-sec) nuclear excursion produced a water hammer with pressures up to 10,000 psi, which, in turn, caused the pressure vessel to rise some 9 feet in the air. (auth).


FINAL REPORT OF SL-1 RECOVERY OPERATION, MAY 1961 THRU JULY 1962 Related Books

FINAL REPORT OF SL-1 RECOVERY OPERATION, MAY 1961 THRU JULY 1962
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 1962 - Publisher:

DOWNLOAD EBOOK

In May, 1961, it waa determined no renewed nuclear reaction in the SL-1 pressure vessel was possible as long as water was excluded. It was therefore possible to
Final Report of SL-1 Recovery Operation
Language: en
Pages: 330
Authors: General Electric Company. Idaho Test Station. SL-1 Project
Categories: Nuclear reactor accidents
Type: BOOK - Published: 1962 - Publisher:

DOWNLOAD EBOOK

Annual Report to Congress of the Atomic Energy Commission for ...
Language: en
Pages: 1834
Authors: U.S. Atomic Energy Commission
Categories: Nuclear energy
Type: BOOK - Published: 1960 - Publisher:

DOWNLOAD EBOOK

Annual Report to Congress of the Atomic Energy Commission
Language: en
Pages: 1092
Authors: U.S. Atomic Energy Commission
Categories: Nuclear energy
Type: BOOK - Published: 1963 - Publisher:

DOWNLOAD EBOOK

Nuclear Science Abstracts
Language: en
Pages: 1468
Authors:
Categories: Nuclear energy
Type: BOOK - Published: 1963-04 - Publisher:

DOWNLOAD EBOOK